Evaluation of performance and environmental benefits of a full-scale pump as turbine system in Antalya water distribution network


Creative Commons License

MUHAMMETOĞLU A., Nursen C., KARADİREK İ. E., MUHAMMETOĞLU H.

WATER SCIENCE AND TECHNOLOGY-WATER SUPPLY, cilt.18, sa.1, ss.130-141, 2018 (SCI-Expanded) identifier identifier

  • Yayın Türü: Makale / Tam Makale
  • Cilt numarası: 18 Sayı: 1
  • Basım Tarihi: 2018
  • Doi Numarası: 10.2166/ws.2017.087
  • Dergi Adı: WATER SCIENCE AND TECHNOLOGY-WATER SUPPLY
  • Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus
  • Sayfa Sayıları: ss.130-141
  • Anahtar Kelimeler: energy production, environmental benefits, pressure reduction, pump as turbine (PAT), water distribution network, water losses, ENERGY RECOVERY, MICRO-HYDROPOWER, PAT DESIGN, REDUCTION, UK
  • Akdeniz Üniversitesi Adresli: Evet

Özet

In recent years, pumps used in turbine mode (pump as turbine, PAT) have started to appear as a viable option to reduce pressure in water distribution networks in addition to energy production at micro scale. In this study, evaluation of performance of a recently installed PAT system in Antalya City, Turkey, is presented for the first operational period of approximately 5 months. This full-scale PAT system was implemented in a parallel pipeline with a pressure reducing valve. The operation of the installed PAT system was continuously monitored online for flow rate, power and pressure. The installed PAT system, being in operation since 26 January 2016, works efficiently in a wide range of inflows (130-300 m(3)/h) and the produced energy varies between 0.7 and 8.4 kWh for a reduction of approximately one bar pressure head with an average efficiency of 60%. Based on the initial 5 months of operational data, environmental benefits of green energy production, reduction in physical water losses and carbon dioxide emissions were evaluated. Based on the implementation cost of the PAT system and the revenues from the environmental benefits, payback period of this specific fullscale PAT application was computed as 53 days or 1.8 months.